Solutions | Depot

Charge the roster under the yard cap

Power is finite. The morning wave is not. Gaadin AI coordinates charging around departure times, vehicle SoC and available site capacity

Gaadin AI depot EV charging managed within site power capacity
Who this page is for

Built for depot operators

For depot managers, fleet operators and yard teams managing multiple EVs, chargers and departure schedules from the same site

Depot charging demand spike when multiple EVs plug in at the same time
Today

Everyone plugs in at 18:00

The vehicles arrive together. The power capacity does not increase with them

Departure

Departure

Which vehicles need to leave first?

SoC

SoC

Which vehicles actually need the most energy?

Power

Power

How much charging load can the site support?

Energy

Energy

When should each vehicle charge to balance readiness and cost?

With Gaadin AI

Charge the right vehicles within the site limit

Bring departure schedules, vehicle SoC, charger availability and site power capacity together to coordinate charging across the yard

Gaadin AI depot charging ordered by vehicle departure time

Departure-Aware Charging

Prioritise vehicles based on when they need to leave and how much energy they need

Gaadin AI depot load held inside the site power limit

Load Management

Coordinate charging demand to keep the depot within its configured power limit

Gaadin AI best charging window for a depot departure

Energy Intelligence

Shift charging where possible to lower-cost periods while keeping vehicles ready for departure

Hardware you already have

Keep the meter and OCPP chargers you already use

Connect your existing site meter, compatible OCPP chargers and vehicle data instead of replacing the infrastructure already deployed at your depot

Book an iCharz Demo
1

Existing site meter

Use available site energy and power data to understand depot demand

2

Existing chargers

Support for compatible OCPP 1.6J and OCPP 2.0.1 charging infrastructure

3

Existing telematics

Use available vehicle and location data from supported telematics systems

4

Hardware-agnostic approach

Connect compatible chargers from different manufacturers through supported integrations

5

Typical deployment

A typical deployment can be around three weeks, depending on integrations, configuration and deployment scope

See how Gaadin AI can coordinate your charging yard

Bring your existing chargers, site meter and compatible vehicle data. We'll show you how Gaadin AI can coordinate charging around your departure schedule and site capacity
Questions

Depot EV charging — FAQs

Answers about depot charging, power management, OCPP chargers, vehicle readiness and energy optimisation

Yes. Gaadin AI can use available departure schedules, vehicle SoC and charging information to help prioritise charging around upcoming vehicle requirements.

Gaadin AI can coordinate charging demand based on the configured site power constraints and available charging infrastructure, helping operators manage charging load across the depot.

Yes. Gaadin AI supports compatible OCPP 1.6J and OCPP 2.0.1 charging infrastructure.

Where supported data is available, Gaadin AI can use site energy and power information to help operators understand and manage depot charging demand.

Yes. Operators can manage multiple locations and charging sites from the same platform, with visibility into vehicles, charging and energy activity.

Gaadin AI's Energy AI can use available energy and charging information to help determine suitable charging periods while considering vehicle readiness and operational requirements.

Yes. Gaadin AI can support mixed fleets, while providing EV-specific charging, energy and battery capabilities for the electric vehicles.

A typical deployment can take approximately three weeks, depending on the number of chargers, site-meter integration, vehicle and telematics integrations, configuration and deployment requirements.